The two maps show information about the differences in room changes in nature museums over a three-year period. Overall, the museums added some exhibitions and became more extensive.
This provided map illustrates the refurbishments of a museum which have been made from 2010 to 2013. Overall, it can be seen that all trees have been removed, and the size of the museum has been widened.
The map illustrates the layout of the Nature Museum in the time periods of 2010 and 2013. The changes that have occured in little more than a decade in the layout and the infrastructure is evidently seen in the map.
The maps display the changes that happened in the layouts of the Nature Museum during the period of three years. Overall, new types of sections have been constructed over the period while the Entrance gate and Ticket des
The map demonstrates that nature museum had been shown changed their site from 2010 and 2013. Overall, it is clear that there was a garden on the right side of the map, which there were many trees in there. After 3 years
The map illustrates how the nature Museum has been transformed from 2010 to 2013. Overall, The Museum Undergone a major transformation and many facilities have been improved.