IELTS Writing Samples by topic

Get a band score and detailed report instantly. Check your IELTS essays right now!
There are two maps below that show us an industrial area in the town of Norbiton. One of them shows the area for now and the other one is a plan for the future that is yet to be executed.
The two map shows information about present as well as planned development of norbiton city in future. At the first glance, we can see that industrial area is replaced with school, shops, medical center and infrastructur
The diagrams illustrate the condition of the factory district in Norbiton town and the projected development of this site in the forthcoming. Overall, it can be seen from the pictures that some features will be added in
The above maps detail Norbiton in the present day and plans for future development. Looking from an overall perspective, it is readily apparent that the municipality will become less industrial and more residential with
These maps illustrate the developmental strategies which are going to taken place in this industrial region in the town of Norbiton. Overall, as we can see, a number of things are going to be constructed such as school,
The maps illustrate an industrial area in the town of Norbiton nowadays and the development plan for the future. Overall, the planned future development aims to turn the industrial area in Norition into a residential.
The given maps illustrate the comparation of Norbiton industrial area in the present with the future of planned development in this area.
The two maps illustrate the present site of the industrial environment of Norbiton and the proposed site for its future advancement. Overall, the major roads of the industrial area are surrounded by factories presently w
The two pictures compare the current industrial area of a city with a plan to develop the same site.
The maps compare the Norbition industrial area now and the planned future development of the site.
The map illustrate that Norbiton industrial area and the planning in the future. It is clear that compared to the current layout, this field wil more convinient in the future.
The maps given depicts an Industrial area in the town of Norbiton currently and the planned future development for the town. Overall, the factory would be replaced by housing and the shops, medical centre, school and pla
The given maps detail the current area and its expected development of a local industrial zone named Norbiton. Overall, the site will be re-designed into a residential area instead of an industrial one with a well-arrang
The maps describe an industrial area in Norbiton nowadays compared with plans for future development. As can be seen in the maps, the town will become more residential with the construction of facilities for housing, sho
🚀 Prepare for IELTS writing section today!
  • Unlimited Task 1 checks
    Get all the feedback you need to keep improving your charts and letters.
  • Unlimited Task 2 checks
    Practice and perfect your skills with essays.
  • Personalized suggestions
    Know how to boost your score.
  • Detailed mistakes analysis
    Get instant feedback. Spot every mistake.
  • Topic ideas generator
    Get topic-specific ideas to enhance your writing.
  • Vocabulary helper
    Get the right words for any topic.
  • Progress tracking
    Track your writing improvements.