The two pictures of the plan illustrate the area of an airport in comparison between the present and future in the coming year. Overall, it can be seen that over the time period the facilities for the southwest airport has dramatic changes by increasing at the expense of bag drop, ATM, sky train, and Car hire. Currently, the airport has not many of infrastructure; however, in the next year, the most significant changes are the number of gates will be increased from 8 gates to 18 gates and the walkway in the top of the airport is demolished and will be developed with a long Sky train. The shops will be constructed next to a security passport control. In the bottom of the airport, the Check-in point will be pulled down to the opposite side in an area of departure and replaced by a bag drop. In addition, the café will be knocked down near departures. In part place of arrivals at present, there is nothing but in the next year, will be built a café, ATM, and car hire along the...